Heat Treatment
CONDITION A--Soak at 1900 F (1038 C) for 30 minutes and cool below 60 F (16 C) for complete martensite transformation. CONDITION H 950- Treat Condition A material at 900 F(482 C) for 1 hour, air cool.. CONDITION H925, H1025, H1075, H1100, H1150- Soak solution treated material for 4 hours at specified temperature, air cool, CONDITION H1150M- Soak solution treated material at 1400 F (760 C) for 2 hours, air cool, then re-heat to 1150 F (620 C) for 4 hours and air cool.
Forging
Soak for 1 hour at 2150 F (1177 C) prior to forging. Do not work below 1850 F (1010 C). Post-work solution treatment is required prior to final hardening.
Hot Working
17-4 PH can be easily hot worked using most of the common processes. It is suggested that material be solution treated at 1900 F(1038 C) then formed during cooling while the material is still austenitic. Post-work solution treatment is required prior to final hardening.
Cold Working
Despite its high initial yield strength, 17-4 can be cold worked successfully by most common methods.
Annealing
1900 F (1038 C), hold for 1/2 hour, rapid cool.
Hardening
This alloy has good ductility and may be readily formed by all conventional methods. Because the alloy is stronger than regular steel it requires more powerful equipment to accomplish forming. Heavy-duty lubricants should be used during cold forming.
(